Raw material is fifty to seventy percent of fastener cost, so every move in wire rod prices reaches the quotation sheet. With steel swinging widely and alloy costs diverging, one price per year no longer holds; the task is to build costing that keeps pace.
From rod to screw there are five steps: drawing, cold heading, thread rolling, heat treatment and finishing. Rod price affects only the first; the rest depends on power, gas, zinc and chemicals. On high-strength bolts, quenching and tempering plus zinc flake coating can exceed the material cost itself. Splitting the quote into material, processing, finishing and packing makes each movement visible.
Grade and cleanliness set unit price, with hundreds of yuan per tonne between cold heading grades. Molybdenum and nickel alloys rise faster in an alloy upcycle, so class 10.9 is more price-elastic. Often missed: extra drawing passes for finer wire, low furnace loading that raises unit energy on small batches, and zinc plus effluent costs.
State a validity period of fifteen or thirty days. Add a raw material clause to framework agreements, referencing a steel index and adjusting beyond a five percent band. Present material and processing separately so talks focus on conversion cost. On annual contracts, index-linked pricing with the mill moves uncertainty off both books.
Cold heading instead of machining lifts utilisation from sixty to over ninety percent, and finishing should match the environment, since indoor parts need no premium coating. Every substitution needs strength and salt spray validation first. Buyers gain steadier prices from monthly frameworks, better forecasts and two or three qualified suppliers. Zhuhai Jiali Hardware (FASTKING) quotes material and processing separately. See the screw calculator directory or contact us.